Eintrag weiter verarbeiten
Long-term production scheduling of open pit mines using particle swarm and bat algorithms under grade uncertainty
Gespeichert in:
Zeitschriftentitel: | Journal of the Southern African Institute of Mining and Metallurgy |
---|---|
Personen und Körperschaften: | |
In: | Journal of the Southern African Institute of Mining and Metallurgy, 118, 2018, 4, S. 361-368 |
Format: | E-Article |
Sprache: | Unbestimmt |
veröffentlicht: |
Academy of Science of South Africa
|
Schlagwörter: |
author_facet |
Khan, A. Khan, A. |
---|---|
author |
Khan, A. |
spellingShingle |
Khan, A. Journal of the Southern African Institute of Mining and Metallurgy Long-term production scheduling of open pit mines using particle swarm and bat algorithms under grade uncertainty Materials Chemistry Metals and Alloys Geotechnical Engineering and Engineering Geology |
author_sort |
khan, a. |
spelling |
Khan, A. 2225-6253 2411-9717 Academy of Science of South Africa Materials Chemistry Metals and Alloys Geotechnical Engineering and Engineering Geology http://dx.doi.org/10.17159/2411-9717/2018/v118n4a5 Long-term production scheduling of open pit mines using particle swarm and bat algorithms under grade uncertainty Journal of the Southern African Institute of Mining and Metallurgy |
doi_str_mv |
10.17159/2411-9717/2018/v118n4a5 |
facet_avail |
Online Free |
finc_class_facet |
Chemie und Pharmazie Geologie und Paläontologie Geographie Technik |
format |
ElectronicArticle |
fullrecord |
blob:ai-49-aHR0cDovL2R4LmRvaS5vcmcvMTAuMTcxNTkvMjQxMS05NzE3LzIwMTgvdjExOG40YTU |
id |
ai-49-aHR0cDovL2R4LmRvaS5vcmcvMTAuMTcxNTkvMjQxMS05NzE3LzIwMTgvdjExOG40YTU |
institution |
DE-Gla1 DE-Zi4 DE-15 DE-Pl11 DE-Rs1 DE-105 DE-14 DE-Ch1 DE-L229 DE-D275 DE-Bn3 DE-Brt1 DE-Zwi2 DE-D161 |
imprint |
Academy of Science of South Africa, 2018 |
imprint_str_mv |
Academy of Science of South Africa, 2018 |
issn |
2411-9717 2225-6253 |
issn_str_mv |
2411-9717 2225-6253 |
language |
Undetermined |
mega_collection |
Academy of Science of South Africa (CrossRef) |
match_str |
khan2018longtermproductionschedulingofopenpitminesusingparticleswarmandbatalgorithmsundergradeuncertainty |
publishDateSort |
2018 |
publisher |
Academy of Science of South Africa |
recordtype |
ai |
record_format |
ai |
series |
Journal of the Southern African Institute of Mining and Metallurgy |
source_id |
49 |
title |
Long-term production scheduling of open pit mines using particle swarm and bat algorithms under grade uncertainty |
title_unstemmed |
Long-term production scheduling of open pit mines using particle swarm and bat algorithms under grade uncertainty |
title_full |
Long-term production scheduling of open pit mines using particle swarm and bat algorithms under grade uncertainty |
title_fullStr |
Long-term production scheduling of open pit mines using particle swarm and bat algorithms under grade uncertainty |
title_full_unstemmed |
Long-term production scheduling of open pit mines using particle swarm and bat algorithms under grade uncertainty |
title_short |
Long-term production scheduling of open pit mines using particle swarm and bat algorithms under grade uncertainty |
title_sort |
long-term production scheduling of open pit mines using particle swarm and bat algorithms under grade uncertainty |
topic |
Materials Chemistry Metals and Alloys Geotechnical Engineering and Engineering Geology |
url |
http://dx.doi.org/10.17159/2411-9717/2018/v118n4a5 |
publishDate |
2018 |
physical |
361-368 |
description |
|
container_issue |
4 |
container_start_page |
361 |
container_title |
Journal of the Southern African Institute of Mining and Metallurgy |
container_volume |
118 |
format_de105 |
Article, E-Article |
format_de14 |
Article, E-Article |
format_de15 |
Article, E-Article |
format_de520 |
Article, E-Article |
format_de540 |
Article, E-Article |
format_dech1 |
Article, E-Article |
format_ded117 |
Article, E-Article |
format_degla1 |
E-Article |
format_del152 |
Buch |
format_del189 |
Article, E-Article |
format_dezi4 |
Article |
format_dezwi2 |
Article, E-Article |
format_finc |
Article, E-Article |
format_nrw |
Article, E-Article |
_version_ |
1792347197158719489 |
geogr_code |
not assigned |
last_indexed |
2024-03-01T17:51:26.719Z |
geogr_code_person |
not assigned |
openURL |
url_ver=Z39.88-2004&ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fvufind.svn.sourceforge.net%3Agenerator&rft.title=Long-term+production+scheduling+of+open+pit+mines+using+particle+swarm+and+bat+algorithms+under+grade+uncertainty&rft.date=2018-01-01&genre=article&issn=2411-9717&volume=118&issue=4&spage=361&epage=368&pages=361-368&jtitle=Journal+of+the+Southern+African+Institute+of+Mining+and+Metallurgy&atitle=Long-term+production+scheduling+of+open+pit+mines+using+particle+swarm+and+bat+algorithms+under+grade+uncertainty&aulast=Khan&aufirst=A.&rft_id=info%3Adoi%2F10.17159%2F2411-9717%2F2018%2Fv118n4a5&rft.language%5B0%5D=und |
SOLR | |
_version_ | 1792347197158719489 |
author | Khan, A. |
author_facet | Khan, A., Khan, A. |
author_sort | khan, a. |
container_issue | 4 |
container_start_page | 361 |
container_title | Journal of the Southern African Institute of Mining and Metallurgy |
container_volume | 118 |
description | |
doi_str_mv | 10.17159/2411-9717/2018/v118n4a5 |
facet_avail | Online, Free |
finc_class_facet | Chemie und Pharmazie, Geologie und Paläontologie, Geographie, Technik |
format | ElectronicArticle |
format_de105 | Article, E-Article |
format_de14 | Article, E-Article |
format_de15 | Article, E-Article |
format_de520 | Article, E-Article |
format_de540 | Article, E-Article |
format_dech1 | Article, E-Article |
format_ded117 | Article, E-Article |
format_degla1 | E-Article |
format_del152 | Buch |
format_del189 | Article, E-Article |
format_dezi4 | Article |
format_dezwi2 | Article, E-Article |
format_finc | Article, E-Article |
format_nrw | Article, E-Article |
geogr_code | not assigned |
geogr_code_person | not assigned |
id | ai-49-aHR0cDovL2R4LmRvaS5vcmcvMTAuMTcxNTkvMjQxMS05NzE3LzIwMTgvdjExOG40YTU |
imprint | Academy of Science of South Africa, 2018 |
imprint_str_mv | Academy of Science of South Africa, 2018 |
institution | DE-Gla1, DE-Zi4, DE-15, DE-Pl11, DE-Rs1, DE-105, DE-14, DE-Ch1, DE-L229, DE-D275, DE-Bn3, DE-Brt1, DE-Zwi2, DE-D161 |
issn | 2411-9717, 2225-6253 |
issn_str_mv | 2411-9717, 2225-6253 |
language | Undetermined |
last_indexed | 2024-03-01T17:51:26.719Z |
match_str | khan2018longtermproductionschedulingofopenpitminesusingparticleswarmandbatalgorithmsundergradeuncertainty |
mega_collection | Academy of Science of South Africa (CrossRef) |
physical | 361-368 |
publishDate | 2018 |
publishDateSort | 2018 |
publisher | Academy of Science of South Africa |
record_format | ai |
recordtype | ai |
series | Journal of the Southern African Institute of Mining and Metallurgy |
source_id | 49 |
spelling | Khan, A. 2225-6253 2411-9717 Academy of Science of South Africa Materials Chemistry Metals and Alloys Geotechnical Engineering and Engineering Geology http://dx.doi.org/10.17159/2411-9717/2018/v118n4a5 Long-term production scheduling of open pit mines using particle swarm and bat algorithms under grade uncertainty Journal of the Southern African Institute of Mining and Metallurgy |
spellingShingle | Khan, A., Journal of the Southern African Institute of Mining and Metallurgy, Long-term production scheduling of open pit mines using particle swarm and bat algorithms under grade uncertainty, Materials Chemistry, Metals and Alloys, Geotechnical Engineering and Engineering Geology |
title | Long-term production scheduling of open pit mines using particle swarm and bat algorithms under grade uncertainty |
title_full | Long-term production scheduling of open pit mines using particle swarm and bat algorithms under grade uncertainty |
title_fullStr | Long-term production scheduling of open pit mines using particle swarm and bat algorithms under grade uncertainty |
title_full_unstemmed | Long-term production scheduling of open pit mines using particle swarm and bat algorithms under grade uncertainty |
title_short | Long-term production scheduling of open pit mines using particle swarm and bat algorithms under grade uncertainty |
title_sort | long-term production scheduling of open pit mines using particle swarm and bat algorithms under grade uncertainty |
title_unstemmed | Long-term production scheduling of open pit mines using particle swarm and bat algorithms under grade uncertainty |
topic | Materials Chemistry, Metals and Alloys, Geotechnical Engineering and Engineering Geology |
url | http://dx.doi.org/10.17159/2411-9717/2018/v118n4a5 |